FMEA
FMEA
Failure Mode and Effects Analysis
1. Overview of FMEA: A Reliability Analysis Technique That Preempts Failure via RPN
flowchart LR
A["Reactive response<br/>after failure occurs<br/>cost & quality loss"] --"Identify and evaluate<br/>potential failure modes in advance"--> B["Prioritize risk<br/>based on RPN"] --"Proactive improvement<br/>of high-risk factors"--> C["Prevent failure<br/>ensure reliability & safety"]
style A fill:#FFEBEE,stroke:#D32F2F,color:#000
style B fill:#E3F2FD,stroke:#1976D2,color:#000
style C fill:#E8F5E9,stroke:#388E3C,color:#000
Definition: A quality/reliability analysis technique that identifies potential failure modes in advance and quantifies risk using RPN (S×O×D) to establish proactive preventive measures.
- Scope of analysis: applied across product design, manufacturing processes, systems, and software
- Core output: RPN = Severity (S) × Occurrence (O) × Detection (D) → prioritize improvement of high-risk items
- Timing: the earlier it is performed in the design/development stage, the lower the correction cost (the 1:10:100 rule)
Characteristics: (Proactive) Removes risk factors at the design/process stage before a failure occurs, minimizing correction cost. (Quantitative prioritization) Uses RPN = S × O × D to numerically objectify the importance of risk factors for prioritizing improvement. (Multi-domain application) Applicable across product design (Design FMEA), manufacturing processes (Process FMEA), and systems (System FMEA).
2. Core Structure of FMEA
a. The 5-Step FMEA Analysis Procedure
flowchart LR
S1["1. Define scope<br/>Scope, function, boundary<br/>form the analysis team"]
S2["2. Identify failure modes<br/>Enumerate<br/>all possible failures"]
S3["3. Analyze effects & causes<br/>Determine failure impact<br/>derive root causes"]
S4["4. Calculate RPN<br/>S × O × D<br/>determine risk priority"]
S5["5. Corrective action<br/>For high-RPN items<br/>establish, execute, verify countermeasures"]
S1 --> S2 --> S3 --> S4 --> S5
S5 -->|"Recalculate RPN<br/>verify effect"| S4
style S1 fill:#E3F2FD,stroke:#1976D2,color:#000
style S2 fill:#F3E5F5,stroke:#7B1FA2,color:#000
style S3 fill:#FFF3E0,stroke:#F57C00,color:#000
style S4 fill:#FFEBEE,stroke:#D32F2F,color:#000
style S5 fill:#E8F5E9,stroke:#388E3C,color:#000
| Step | Key Activities | Output |
|---|---|---|
| 1. Define scope | Set product/process scope, create functional block diagram | Scope definition document, function list |
| 2. Identify failure modes | Enumerate all potential failure modes for each function | Failure mode list |
| 3. Analyze effects & causes | Analyze the effect of failure on system/users, root cause analysis | Effect/cause analysis table |
| 4. Calculate RPN | Score S, O, D each on a 1–10 scale, calculate RPN, set thresholds | FMEA worksheet |
| 5. Corrective action | Establish, execute, and reassess improvement plans for high-risk items | Corrective action plan |
b. RPN Calculation and Risk Management
flowchart TD
subgraph R1[""]
direction LR
SE["Severity<br/>Magnitude of impact<br/>on the user/system<br/>1 (minor) ~ 10 (critical)"]
OC["Occurrence<br/>Likelihood/frequency<br/>of the failure mode<br/>1 (rare) ~ 10 (high)"]
end
subgraph R2[""]
direction LR
DT["Detection<br/>Ability to detect<br/>the failure before shipment<br/>1 (easily detected) ~ 10 (undetectable)"]
RPN["RPN<br/>Risk Priority Number<br/>= S × O × D<br/>the higher, the more urgent the fix"]
end
style SE fill:#E3F2FD,stroke:#1976D2,color:#000
style OC fill:#F3E5F5,stroke:#7B1FA2,color:#000
style DT fill:#FFF3E0,stroke:#F57C00,color:#000
style RPN fill:#1E3A5F,stroke:#1E3A5F,color:#fff
style R1 fill:none,stroke:none
style R2 fill:none,stroke:none
Action Criteria Based on RPN Thresholds
| RPN Range | Risk Level | Recommended Action |
|---|---|---|
| 200+ | Very high | Immediate design/process change required |
| 100–199 | High | Establish and execute a short-term improvement plan |
| 50–99 | Medium | Review improvement options, strengthen monitoring |
| Below 50 | Low | Maintain current level, periodic review |
Application by FMEA Type
| Type | Timing | Scope of Analysis | Key Use |
|---|---|---|---|
| System FMEA | Concept design stage | Overall system structure | Analyze inter-system interface risk |
| Design FMEA | Detailed design stage | Parts/component design | Proactively remove design weaknesses |
| Process FMEA | Manufacturing/service process | Process/procedure steps | Prevent process defects and variation causes |
| Software FMEA | SW design/development stage | Modules, functions, interfaces | Prevent software defects and failures |
3. Expected Benefits and Application of FMEA
| Category | Expected Benefits | Application and Practical Use |
|---|---|---|
| Proactive quality management | Removes failures early in design/development, minimizing correction cost (the 1:10:100 rule) | Proactively remove high-risk design elements with Design FMEA before product launch |
| Reliability & safety | Focuses management on causes of critical failure through RPN-based prioritization | Meets certification requirements for safety-critical systems such as medical devices, automotive, and aviation |
| Process improvement | Systematically manages sources of variation in manufacturing/service processes with Process FMEA | Analyzes architecture and interface risk with SW FMEA before sprint kickoff |
| Cost reduction | Reduces warranty, recall, and rework costs and preempts customer claims | Combined with the Analyze phase of Six Sigma DMAIC for root-cause improvement |